Sofema Aviation Services (SAS) is pleased to share that the EASA Part 145 – Aviation Production Planning – 4 Days was delivered to delegates from Aero Asia:
EASA Part 145 –Aviation Production Planning – 4 Days
The knowledgeable SAS instructor Murray Pine conducted the training as an in-company classroom.
About the training
The EASA Part 145 Aviation Production Planning 4-day course is designed for professionals involved in production planning within EASA Part 145 organizations. It provides a comprehensive understanding of the regulatory environment, responsibilities, and best practices in production planning. Key areas covered include managing competencies, optimizing planning processes, critical path analysis, and the integration of Safety Management Systems (SMS) within maintenance operations. Participants will also gain insight into managing subcontractors, equipment, and maintenance data. By the end of the course, attendees will be equipped to enhance operational efficiency and ensure full compliance with industry standards. This training is essential for personnel in management, quality assurance, or CAMO roles.
Get to know the instructor
Murray Pine has over 45 years of experience in Commercial Aviation. He is a graduate of Canterbury Technical College. Murray started his career in 1978 as an approved mechanic in Dan Air Lasham. Over the years, the instructor gained experience in Aircraft Maintenance, Base Maintenance, Aircraft Engineering, Quality Assurance, Auditing, Safety Management – Technical & Quality Investigations, Flight Crew Management, Project Engineering, and Aviation Training.
Murray is also experienced in Aircraft Leasing and Technical Records. As an onsite Inspector/Manager for Lease Return, the instructor was involved in the following: Lease return conditions review and validation, full inspection of the aircraft, and raising of findings requiring rectification, dent & buckle chart review and validation, review of all Hard Copy records, all main A/F and engine LLP review, checking all Return to Service ISATFM requirements, engine running and borescope validation, final review of the compliance of AA Lease return conditions, and validation of all outstanding findings. In 2021-2022, he completed a total of 6 Mid-Term inspections and Records reviews on B777-300ER, A320, and A330 aircraft. Additionally, he has completed 2 End of Lease Return/Transition to a new operator of A320 aircraft. Read more about Murray.
Benefit from our services – Sign up for the EASA Part 145 – Aviation Production Planning – 4 Days training
Tags:
EASA Part 145 Aviation Production Planning, Soekarno-Hatta International Airport, and Overhaul (MRO) services, A330 aircraft, B777-300ER, ISATFM, Flight Crew Management, Dan Air Lasham, Safety Management – Technical & Quality Investigations, Canterbury Technical College, EASA Part 145 organizations, Aero Asia, EASA Part 145 - Aviation Production, GMF AeroAsia, Aviation Safety Management Systems (SMS), Aircraft Maintenance, A320 Family, industry standards, CAMO (Continuing Airworthiness Management Organization), Project Engineering, Aircraft Engineering, Safety Management Systems (SMS), Repair, Base Maintenance, commercial Aviation, Quality Assurance, Maintenance, Aviation Training, Aviation Quality Assurance, Auditing