Maintenance Programme Approval Requirements for RVSM

Maintenance Programme Approval Requirements for RVSM Sofema Aviation Services www.sassofia.com takes a look at the requirements to ensure the Maintenance Program is correctly configured for Reduced Vertical Separation Minima (RVSM) Introduction  This approved maintenance program shall identify all aircraft components required for RVSM together with scheduled requirements. These components have been identified by the aircraft manufacturer and should be…

Read more

Introduction to Reduced Vertical Separation Minima (RVSM)

Introduction to Reduced Vertical Separation Minima (RVSM)   1982 saw considerable efforts focused on the feasibility of RVSM. Under the overall guidance of the ICAO Review of the General Concept of Separation Panel (RGCSP), several States initiated a series of comprehensive work programmes to examine the feasibility of reducing the vertical separation minimum above FL 290…

Read more

RVSM Continued Airworthiness & Maintenance Requirements

Continuing Airworthiness Considerations Considerations related to Aircraft Maintenance Programme (AMP) and continuing airworthiness procedures in support of the Reduced Vertical Separation Minima (RVSM) operations. RVSM Maintenance Practices and Procedures Aircraft Minimum Equipment List (MEL) – Where applicable, a minimum equipment list (MEL), adapted from the master minimum equipment list (MMEL), and should include items pertinent to operating…

Read more

EASA 145 Organisations Internal Reporting Effectiveness

General understanding regarding reporting  Are you familiar with AMC 20-8 How effective is your personal reporting into your organisations Quality System? How many times have you reported in the last 12 months? Are you familiar with the Voluntary Reporting System? If yes when do see it being used? – General Why do Organisations “under perform”…

Read more