Maintenance Review Board Report

The MSG-3 Philosophy: An Aviation Maintenance Story in Six Chapters

read more
Aviation Maintenance

June 19, 2026

Steven Bentley

The diagram provided outlines the logic flow used to determine the necessary maintenance tasks for an aircraft component, ensuring high safety standards and optimized operational costs as required by EASA Part M. We follow the lifecycle of a component – like a complex hydraulic pump – to illustrate how this framework is applied.   Chapter…

MSG 3 Aircraft Inspection Considerations

read more
MSG 3

March 08, 2021

Steven Bentley

MSG 3 Aircraft Inspection Considerations – Introduction by Sofema Aviation Services (SAS) www.sassofia.com What is MSG 3 MSG stands for Maintenance Steering Group (3 is the 3rd version of the process and has been around since 1980). It provides a process which is used for developing scheduled maintenance tasks and intervals, which will be acceptable to the…

Developing the Aircraft Maintenance Planning Document (MPD)

read more

June 10, 2014

Steven Bentley

The  Industry Steering Committee (ISC) comprises operators, manufacturers, and regulators who follow the guidance outlined in Advisory Circular AC 121-22A , based on use of ATA MSG 3 methodology to develop the scheduled maintenance program for a given aircraft systems structure and engines which results in the maintenance Review Board Report (MRBR).  The MRBR is…