EASA

Guide to Auditing EASA Part 145 Competence Management and Assessment

read more

October 09, 2012

Steven Bentley

Presented by Steven Bentley MD of Sofema Aviation services comments or observations are welcome please email [email protected] The following non exhaustive list is a guide to the effective auditing of Competence Management in a EASA Part 145 organization. All requirements are derived from either IR Implementing Rule requirements. Or AMC Acceptable Means of Compliance requirements….

EASA Part Ops and the Responsibility of the Ground Operations Post Holder

read more

September 25, 2012

Steven Bentley

An overview document presented by Steven Bentley MD Sofema Aviation Services. “OR.GEN 200” applies to all commercial operators and non-commercial operators of complex motor-powered aircraft. It requires them to have an integrated management system, including an SMS. Typical responsibilities of the Ground Operations Post Holder will include ensuring the company’s compliance with  EASA regulations and …

Introduction to EASA Authority, Organisation and Operations Requirements for Aerodromes.

read more

September 10, 2012

Steven Bentley

Presented by Sofema Aviation Services www.sassofia.com EASA Basic Regulation (EC) No 216/2008 as amended by Regulation (EC) No 1108/2009 (hereafter referred to as the ‘Basic Regulation’) included aerodromes and ATM/ANS into the European aviation safety regulatory system. Notice of Proposed Amendment NPA 2011-20 (A) 09/12/2011 introduces rules applicable to aerodromes. The Implementing Rules (IRs) will become…

Part OPS – Moving the Goal Posts – Part AR and Part OR are finished before they start!

read more

September 01, 2012

Steven Bentley

Please be very careful when you see the terms AR and or OR in connection with EASA Part Operations regulations as these terms are now redundant. Steven Bentley MD of Sofema Aviation Services explains further How it Was going to be – Part AR  – The key elements of Part-AR included the oversight of all…